Tunnel construction, below ground, built to last.

Cut-and-cover boxes, portals, linings and crossings, kept dry and true to line.

Send drawings and BOQ

How we build it

  1. Excavate and support

    Steel ribs and rock bolts set

  2. Waterproof

    Membrane and drains fixed

  3. RCC lining

    Cast on a travelling shutter

  4. Road and finish

    Road, lights, handed over

What the scope covers

Cut-and-cover box structures
Excavate, build the RCC box, backfill
Portals and shafts
Entry structures and vertical access shafts
RCC tunnel lining
Cast-in-place lining with planned pour joints
Underpasses and culverts
Road and drainage crossings
Dewatering and waterproofing
Groundwater control and membrane systems

Owned for this work

1,150 MT cup-lock props and falsework, 2,000 MS scaffolding H-frames and 4 FVR 600 compaction rollers for backfill.

See the full fleet

Questions

Short answers on scope, plant and pricing for this work.

Talk to Rajat Kate, +91 77438 51234How we run every site
What tunnel work do you do?

We build cut-and-cover box structures, portals and shafts, cast-in-place RCC tunnel linings, underpasses and culverts, with dewatering and waterproofing. The work runs in four steps: excavate and support with steel ribs and rock bolts, waterproof with membrane and drains, cast the lining on a travelling shutter, then finish the road and lights.

What plant do you own for tunnel and underpass work?

For tunnel work we own 1,150 MT of cup-lock props and falsework, 2,000 MS scaffolding H-frames and 4 FVR 600 compaction rollers for backfill. This plant sits on our own books, so we can mobilise in days and keep critical pour dates instead of waiting in a rental queue.

How do you keep a tunnel dry?

We control groundwater and waterproof the tunnel before the lining goes in. Dewatering keeps the excavation dry, and a membrane and drains are fixed before the RCC lining is cast on a travelling shutter. Pour joints in the cast-in-place lining are planned in advance, so the structure stays dry and true to line.

How is quality checked on a tunnel lining?

Every pour, tunnel linings included, passes our four QA/QC gates. Material is checked at the gate against the challan and test certificates. Reinforcement, cover and shuttering are checked before the pour, slump and cube samples during it, and 7- and 28-day cube results with line and level after it.

Send your drawings and BOQ.

We’ll come back with a priced BOQ, a clear scope and a day-wise programme.

Email your drawings

Call +91 77438 51234WhatsApp