Established in 2011. Clear owners, every site.

Directors over 5 head-office departments, 4 special teams and 4 key sites.

Head office

Execution
Day-wise programme, DPR every evening
HR
Hiring for next month closed by the 25th
Purchase
Materials through a fixed panel of 5–8 vendors
Billing
Client RA bills submitted by the 15th
Accounts
One ERP as the book of record

Special teams

Design analysis
Six checks before a drawing reaches site
Planning and control
Monthly plan, daily control

Sites

Kohinoor HO, on site
Kohinoor Group, Shivajinagar
Kenvista, on site
Puravankara, Kondhwa
Gangadham Tower, C-Wing
Market Yard, Pune
The Curve, awarded
Abhinav Group, Virar

Governed in-house, approvals planned up front.

Daily
Site huddle and DPR
Site engineer
Weekly
Progress review with the client
Project manager
Monthly
MIS, cost and billing review
Directors
Quarterly
Management review
Directors
Who prepares, who approves
DocumentSite engineerProject managerBillingDirector
Material indentPreparesApprovesNoneNone
Purchase orderNonePreparesNoneApproves
Work orderNonePreparesNoneApproves
VariationPreparesPreparesNoneApproves
RA billNoneApprovesPreparesApproves
Payment releaseNoneNonePreparesApproves

Our own workforce, managed and compliant.

In-house labour on our own rolls
350+
White-collar staff to labour, roughly
1 : 5
Recruit to retain
  1. RecruitTrade-wise hiring drives
  2. Trade testSkills checked before joining
  3. InductID, safety induction, PPE issue
  4. DeployGangs sized to the month plan
  5. PayWages into bank accounts
  6. RetainTraining and the next site
Looked after on every site
  • Labour camps
  • Drinking water
  • Sanitation
  • First aid
  • Safety induction
  • PPE issued on joining
Compliance on every site
  • BOCW registration for construction workers
  • PF and ESIC enrolment
  • Minimum wages, paid into bank accounts
  • Camps with water, sanitation and first aid
  • Contract labour licence (CLRA Act)
  • Accident and employee compensation cover
  • Statutory registers, wage slips, attendance
  • Age and ID checks: no child labour

Built to ISO standards. Checked at every pour.

Major accidents in 13 years
0
PPE checked at the gate
100%
Toolbox talks before work
Daily

QA/QC gates on every pour

  1. Material at the gate
    • GRN against challan
    • Mill test certificates
    • Third-party lab tests
  2. Before the pour
    • Reinforcement and cover
    • Shuttering line and level
    • Pour card signed
  3. During the pour
    • Slump checks
    • Cube samples taken
    • Vibration and curing
  4. After the pour
    • 7- and 28-day cube results
    • Line, level, verticality
    • Stage sign-off to proceed
The safety system on site
  • Full-shift safety officer on site
  • Trained safety stewards
  • Height-work permits and barricading
  • Safety status in every daily DPR

Sixteen times, in four years.

152% three-year turnover CAGR.

  1. ₹4.8 CrFY 21–22Actual
  2. ₹13.15 CrFY 22–23Actual
  3. ₹45.51 CrFY 23–24Actual
  4. ₹77 CrFY 24–25Actual
  5. ₹125 CrFY 25–26Projected
Turnover, ₹ in crores

Key facts about Grey Infra Associates

Founded
2011, Pune, Maharashtra
Head office
3rd Floor, P.K. Chowk, Govind Asterra, Opp. Poorva Residency, Pimple Saudagar, Pune, Maharashtra 411027
Services
Steel and RCC construction, High-rise construction, Tunnel construction, Government and heritage
Workforce
425+ people: 350+ in-house labour and 75+ white-collar staff
Footprint
Pune, Pimpri-Chinchwad, Navi Mumbai, Kolhapur, Goa, Pandharpur, Virar, Mumbai
Turnover (actual)
₹4.8 Cr in FY 2021–22; ₹13.15 Cr in FY 2022–23; ₹45.51 Cr in FY 2023–24; ₹77 Cr in FY 2024–25
Safety record
0 major accidents in 13 years; 100% PPE checked at the gate
Owned plant
2 ACE Tower Crane TC5034, 50 m jib; 1 ACE Movable Tower Crane MTC3625, 36 m jib; 2 Aquarius 1407D Concrete Pump (with GS); 12 PAN Mixers; 5 Concrete Lifts; 3600 m² Mivan Shuttering, columns and RCC shear walls
Clients
Bramha Corp., Puravankara, Kohinoor Group, Abhinav Group, Gokhale Landmark, Savani Heritage, Raviraj Associates, Shreedhar Associates, R R Ventures, Contigo Eduworld

Source: company profile FY 2025–26, updated November 2026.