One execution framework. Every site, every day.

Design analysis, a computed programme, daily control and one ERP as the book of record.


Six stages, the same on every site.

Every drawing is checked before it reaches site.

Our construction services
  1. Pre-construction

    Drawing and BOQ study, site survey, design analysis.

    Design analysis report

    Design team

  2. Planning

    Master programme, month plan, labour, plant and material plan.

    Approved programme

    Planning engineer

  3. Mobilisation

    Letter of acceptance, own plant and crews on site.

    Site ready in days

    Project manager

  4. Execution

    Day-wise work fronts, pour cards, QA/QC gate sign-off.

    Daily DPR by 17:45, every working day

    Site engineer

  5. Control

    Plan vs actual, weekly client review, RA bill by the 15th.

    MIS and RA bill

    Billing and PM

  6. Handover

    Snags closed, test records, as-built drawings.

    Handover file

    Project manager

Six checks on every drawing
Constructability
Can it be built as drawn, and in what sequence?
Clash and dimension
Grids, levels, openings and MEP sleeves.
Steel optimisation
BBS, laps and cutting waste.
Formwork and pours
Mivan fit, pour joints and sequence.
Temporary works
Props, scaffolds and crane bases.
Quantities vs BOQ
Variations flagged before work starts.
From drawings to a site-ready pack
What we receive
Architectural drawings, Structural drawings, BOQ and specifications, Soil and site data.
Who checks it
Structural engineer, Planning engineer, Quantity surveyor, BBS detailer.
What site gets
RFI log to consultant, BBS and cutting lists, Pour and formwork plan, Value-engineering notes.

Planned every month. Controlled every day.

  1. 1stExecution targets issued to every sitePlanning engineer
  2. 15thClient RA bills submitted, strictlyBilling
  3. 25thHiring for next month closedHR
  4. 27-28thNext month’s plan draftedPlanning engineer
  5. 30thPlan frozen against billing targetsDirectors
What we control each month
Programme
Planned vs actual. Tracked daily, per work front.
Cost
Budget vs actual. Reviewed monthly, per site.
Material
Issued vs consumed. Reconciled against GRNs.
Labour
Month plan. Gangs sized to each month’s plan.
Purchase
5-8 vendors. A fixed, approved panel.
The monthly loop
Billing target, site execution targets, daily DPR actuals, plan vs actual, re-plan next month.

Tech-enabled, from site to client.

Our own custom-specified ERP is the book of record for every site, vendor and rupee.

Projects we run this way
  • Daily DPREvery working day
  • ProgrammeAI-sequenced pours
  • Materials and GRNVerified at the gate
  • Vendor portalRates, work orders and bills
  • Running billsMeasured and certified
  • AccountsFull book of record
  • Site photosDated, by work front
  • Client dashboardLive, every evening
Specified by us, for how we build.
Own specification
Written around RCC contracting, not a generic package.
Our site process
DPR, GRN, bills and approvals follow how our sites run.
Owned by us
New reports and checks added as our sites need them.
Site data
Labour, material and machinery, logged daily.
Custom ERP
Schedule, cost and forecast.
Client view
DPR, dashboard and bills.

Send your drawings and BOQ.

We’ll come back with a priced BOQ, a clear scope and a day-wise programme.