Excavate and PCC
Dig to grade, cast the PCC bed
Footing
BBS-checked steel, then pour
Column and core
Cast on Mivan or conventional forms
Beam and slab
Propped, poured and cured
Steel and RCC, foundation to roof slab.
Structural frames in steel and reinforced concrete, built to IS code from raft to roof.
Send drawings and BOQHow we build it

What the scope covers
- Raft, pile and footing foundations
- Excavation, PCC, reinforcement and pours to grade
- Columns, shear walls and lift cores
- Vertical elements cast on Mivan or conventional forms
- Structural steel and composite decks
- Steel frames working with concrete decks
- Retaining walls and basements
- Earth-retaining structures and basement boxes
- BBS-led reinforcement, IS-code RCC
- Bar-bending schedules checked before steel is cut
Owned for this work
3,600 m² Mivan aluminium formwork for walls and columns, 2 Aquarius 1407D concrete pumps and 12 PAN mixers, plus 3 concrete mixers.
See the full fleetBuilt to ISO standards. Checked at every pour.
Material at the gate
- GRN against challan
- Mill test certificates
- Third-party lab tests
Before the pour
- Reinforcement and cover
- Shuttering line and level
- Pour card signed
During the pour
- Slump checks
- Cube samples taken
- Vibration and curing
After the pour
- 7- and 28-day cube results
- Line, level, verticality
- Stage sign-off to proceed
Questions
Short answers on scope, plant and pricing for this work.
Talk to Rajat Kate, +91 77438 51234How we run every siteWhat steel and RCC work do you take on?
We build structural frames in steel and reinforced concrete, to IS code, from raft to roof. Our scope covers raft, pile and footing foundations, columns, shear walls and lift cores, structural steel and composite decks, and retaining walls and basements. Bar-bending schedules are checked before any steel is cut.
How do you check quality on RCC pours?
Every pour passes four QA/QC gates. Gate 1 checks material against the challan, mill test certificates and third-party lab tests. Gate 2 checks reinforcement, cover and shuttering before the pour. Gate 3 covers slump, cube samples and vibration. Gate 4 checks 7- and 28-day cube results, line, level and verticality.
What plant do you own for RCC work?
For RCC work we own 3,600 m² of Mivan aluminium formwork for walls and columns, 2 Aquarius 1407D concrete pumps, 12 PAN mixers and 3 concrete mixers. This plant is on our own books, so we mobilise in days and pour dates hold when rental markets are tight.
Do you check structural drawings before work starts?
Yes, our design analysis team runs six checks on every drawing before it reaches site: constructability, clash and dimension, steel optimisation, formwork and pours, temporary works, and quantities against the BOQ. Site then gets an RFI log, BBS and cutting lists, a pour and formwork plan and value-engineering notes.
Send your drawings and BOQ.
We’ll come back with a priced BOQ, a clear scope and a day-wise programme.